LEARNING MANAGEMENT SYSTEM
PROJECT
PREPARATION AND DELIVERY OF STUDY MATERIAL TO DRIVE SUCCESS OF RIG STAFF IN PASSING FLAG STATE EXAMINATIONS
​
HOW
DEVELOPED PROGRAM WITH BACK END ANALYTICS ENABLING MONITORING OF PROGRESS, AND CUSTOMISATION OF STUDY MATERIAL BASED ON LEARNER APTITUDE AND PERFORMANCE
LEGAL CASE MANAGEMENT
PROJECT
COORDINATED LEGAL DEFENCE ACROSS MULTIPLE JURISDICTIONS AND SUBJECT MATTER SPREAD ACROSS 25 YEARS OF BUSINESS ACTIVITY
​
HOW
ESTABLISHED SYSTEM FOR ARCHIVING, TAGGING AND SORTING DOCUMENTATION, THEREBY CROSS INDEXING OF SUBJECT MATTER OF AFFIDAVITS FILED BY OPPOSITION, YIELDING POSITIVE RESULTS
DAILY CONTROL OF WORK
PROJECT
DEVELOP A SMART SYSTEM FOR THE RIG'S DEPARTMENT HEADS TO COORDINATE DAILY ACTIVITIES & SIMULTANEOUS OPERATIONS (SIM OPS)
​
HOW
COLLATED PROCEDURES, MACHINERY LOCATIONS, WORK PERMISSIONS, JOB STATUSES, AND CROSS INDEXED TO ALLOCATE USER PERMISSIONS SUITABLY
CASUALTY RECOVERY
PROJECT
LED TEAMS FOR OPERATIONS, COMMERCIAL / LITIGATION AND FINANCIAL. COORDINATED AND PRIORITISED ACTIVITIES IN REAL TIME
​
HOW
ACHIEVED BY INTEGRATING SOFTWARE TOOLS FOR SCHEDULING, INVOICING, PAYMENTS, PAYROLL AND PROJECT MANAGEMENT
CRANE OPERATION SIMULATION
PROJECT
LAST MINUTE SETUP OF HI SPEC FACILITY, INCLUDING PREP OF DETAILED SIMULATOR SCENARIOS AS SPECIFIED BY THE CLIENT
​
HOW
SOURCED SIMULATION PROVIDERS, PREMISES, OPITO-CERTIFIED INSTRUCTOR, AND PROVIDED TRAINING AND ORIENTATION FOR ASSESSOR AND SITE MANAGEMENT
3-RIG DOCKING SUPERVISION
PROJECT
LATE STAGE TAKEOVER OF DRY DOCK SUPERVISIONS AT A REMOTE LOCATION. SCOPE INCLUDED VENDOR & MATERIALS LOGISTICS AND JOB PLANNING
​
HOW
ESTABLISHED WORKFLOWS FOR RAPID HIRING AND TRAINING OF STAFF, UPDATING PROCEDURES AND DAILY REPORTS ACROSS DISPARATE TEAMS OF OVER 50 DEPARTMENTS AND 1000 PEOPLE
RAISING OF PIRATE RANSOM
PROJECT
RAISED FUNDS TO PAY SECOND RANSOM AFTER INITIAL DOUBLE CROSS BY SOMALI PIRATES AND OWNER'S ABANDONMENT OF CREW
​
HOW
RAN A SCHEDULED EMAIL CAMPAIGN OVER A 3-YEAR PERIOD USING AUTO RESPONDER AND DECISION TREE FUNCTIONALITY, AND ACROSS A LARGE STAKEHOLDER BASE OF RECIPIENTS
DESIGNS & RETROFITS
PROJECT
MEASUREMENT, ANALYSIS AND DESIGN OF VARIOUS STRUCTURES AND MACHINERY REFITS ACROSS AGED SEMI SUB RIGS
​
HOW
SOURCED INPUTS FROM VARIOUS RIG PERSONNEL, MANAGERS AND DESIGNERS AND THEN FACILITATED COLLABORATION TO SELECT THE OPTIMUM DESIGN BASED ON TIME AND COST
DESIGN & TEST OF INSTALLATION
PROJECT
POSITIONING OF PRE CAST STRUCTURE FROM LIFTING POINT TO END OF BUILDING PLATFORM, INHIBITED BY CRANE REACH AND AIR DRAFT
​
HOW
AIDED IN DESIGN AND FABRICATION OF PULLEY CONTROLLED ROLLING MECHANISM TO POSITION STRUCTURE WITHOUT HUMAN INTERVENTION
CRANE & LIFTING CONSULTING
PROJECT
PROVIDED SOLUTION TO REACTIVATE A 6-BUILDING SITE THAT HAD BEEN SHUT DOWN DUE TO REPEAT ACCIDENTS
​
HOW
SOURCED & PREPARED DOMAIN EXPERT FROM OIL & GAS INDUSTRY TO PASS ASSESSMENT CRITERIA OF US-BASED HSE TEAM, AND ASSUME FULL RESPONSIBILITY OF ALL LIFTING SCOPES
DESIGN OF TRAILER
PROJECT
TRANSFER OF PRE CAST CONCRETE STRUCTURE TO LIFTING POINT ALONG NARROW PATH AND AMONG CONSTRAINED SPACES
​
HOW
COLLABORATED WITH MULTIPLE TEAMS TO ESTABLISH THE TOOLS, RESOURCES AND BUDGET AVAILABLE. CARRIED OUT DRY RUN SCENARIOS PRIOR TO SIGNING OFF ON PROTOTYPE