top of page
LEARNING MANAGEMENT SYSTEM

PROJECT

PREPARATION AND DELIVERY OF STUDY MATERIAL TO DRIVE SUCCESS OF RIG STAFF IN PASSING FLAG STATE EXAMINATIONS

​

HOW

DEVELOPED PROGRAM WITH BACK END ANALYTICS ENABLING MONITORING OF PROGRESS, AND CUSTOMISATION OF STUDY MATERIAL BASED ON LEARNER APTITUDE AND PERFORMANCE

LEGAL CASE MANAGEMENT

PROJECT

COORDINATED LEGAL DEFENCE ACROSS MULTIPLE JURISDICTIONS AND SUBJECT MATTER SPREAD ACROSS 25 YEARS OF BUSINESS ACTIVITY

​

HOW

ESTABLISHED SYSTEM FOR ARCHIVING, TAGGING AND SORTING DOCUMENTATION, THEREBY CROSS INDEXING OF SUBJECT MATTER OF AFFIDAVITS FILED BY OPPOSITION, YIELDING POSITIVE RESULTS

DAILY CONTROL OF WORK

PROJECT

DEVELOP A SMART SYSTEM FOR THE RIG'S DEPARTMENT HEADS TO COORDINATE DAILY ACTIVITIES & SIMULTANEOUS OPERATIONS (SIM OPS)

​

HOW

COLLATED PROCEDURES, MACHINERY LOCATIONS, WORK PERMISSIONS, JOB STATUSES, AND CROSS INDEXED TO ALLOCATE USER PERMISSIONS SUITABLY

CASUALTY RECOVERY

PROJECT

LED  TEAMS FOR OPERATIONS, COMMERCIAL / LITIGATION AND FINANCIAL.  COORDINATED AND PRIORITISED ACTIVITIES IN REAL TIME

​

HOW

ACHIEVED BY INTEGRATING SOFTWARE TOOLS FOR SCHEDULING, INVOICING, PAYMENTS, PAYROLL AND PROJECT MANAGEMENT

CRANE OPERATION SIMULATION

PROJECT

LAST MINUTE SETUP OF HI SPEC FACILITY, INCLUDING PREP OF DETAILED SIMULATOR SCENARIOS AS SPECIFIED BY THE CLIENT

​

HOW

SOURCED SIMULATION PROVIDERS,  PREMISES, OPITO-CERTIFIED INSTRUCTOR, AND PROVIDED TRAINING AND ORIENTATION FOR ASSESSOR AND SITE MANAGEMENT

3-RIG DOCKING SUPERVISION

PROJECT

LATE STAGE TAKEOVER OF DRY DOCK SUPERVISIONS AT A REMOTE LOCATION. SCOPE INCLUDED VENDOR & MATERIALS LOGISTICS AND JOB PLANNING 

​

HOW

ESTABLISHED WORKFLOWS FOR RAPID HIRING AND TRAINING OF STAFF, UPDATING PROCEDURES AND DAILY REPORTS ACROSS DISPARATE TEAMS OF OVER 50 DEPARTMENTS AND 1000 PEOPLE

RAISING OF PIRATE RANSOM

PROJECT

RAISED FUNDS TO PAY SECOND RANSOM AFTER INITIAL DOUBLE CROSS BY SOMALI PIRATES AND OWNER'S ABANDONMENT OF CREW

​

HOW

RAN A SCHEDULED EMAIL CAMPAIGN OVER A 3-YEAR PERIOD USING AUTO RESPONDER AND DECISION TREE FUNCTIONALITY, AND ACROSS A LARGE STAKEHOLDER BASE OF RECIPIENTS

DESIGNS & RETROFITS

PROJECT

MEASUREMENT, ANALYSIS AND DESIGN OF VARIOUS STRUCTURES AND MACHINERY REFITS ACROSS AGED SEMI SUB RIGS

​

HOW

SOURCED INPUTS FROM VARIOUS RIG PERSONNEL, MANAGERS AND DESIGNERS AND THEN FACILITATED COLLABORATION TO SELECT THE OPTIMUM DESIGN BASED ON TIME AND COST

DESIGN & TEST OF INSTALLATION 

PROJECT

POSITIONING OF PRE CAST STRUCTURE FROM LIFTING POINT TO END OF BUILDING PLATFORM, INHIBITED BY CRANE REACH AND AIR DRAFT

​

HOW

AIDED IN DESIGN AND FABRICATION OF PULLEY CONTROLLED ROLLING MECHANISM TO POSITION STRUCTURE WITHOUT HUMAN INTERVENTION  

CRANE & LIFTING CONSULTING

PROJECT

PROVIDED SOLUTION TO REACTIVATE A 6-BUILDING SITE THAT HAD BEEN SHUT DOWN DUE TO REPEAT ACCIDENTS

​

HOW

SOURCED & PREPARED DOMAIN EXPERT FROM OIL & GAS INDUSTRY TO PASS ASSESSMENT CRITERIA OF US-BASED HSE TEAM, AND ASSUME FULL RESPONSIBILITY OF ALL LIFTING SCOPES

DESIGN OF TRAILER

PROJECT

TRANSFER OF PRE CAST CONCRETE STRUCTURE TO LIFTING POINT ALONG NARROW PATH AND AMONG CONSTRAINED SPACES

​

HOW

COLLABORATED WITH MULTIPLE TEAMS  TO ESTABLISH THE TOOLS, RESOURCES AND BUDGET AVAILABLE.  CARRIED OUT DRY RUN SCENARIOS PRIOR TO SIGNING OFF ON  PROTOTYPE 

bottom of page